Important Installation Information

Accepted installations may start setting up no earlier than 9 August and must be completely finished by 11 August 2001. Please refer to shipping information and the following information for assistance with your installation set-up. If you need additional assistance, please contact Mk or Katie at etech-s2001@siggraph.org at any time.

SIGGRAPH Provides:
  * with complete specification of contributor requirements (i.e. The Presenter Input Data Form (form sent to you via email) completed by 12 March 2001.)

  1. Installation Space
  2. Carpeting and decorated environment
  3. Electricity
      Note: Electrical power in a convention center is always subject to fluctuations. We strongly recommend you bring an uninterruptible power supply (UPS) or line conditioner for any power-sensitive computer or A/V equipment you plan to use on site at SIGGRAPH 2001. Also, the Los Angeles Convention Center does not provide any type of electrical transformer to accommodate for voltage differences that may exist with different European equipment. If you are bringing such equipment please be prepared to provide the proper transformers required to run your equipment.
  4. Furnishings (tables, chairs, scaffolding, etc.) - venue design and furnishing styles are at the discretion of the program chair.
  5. Descriptive Signage
  6. Rigging / Lighting
  7. Networking connection to the conference GraphicsNet and Internet. SIGGRAPH does not provide ISDN Service, but it is available to rent.
  8. Security
  9. Documentation
  10. Conference Access

Contributor Responsibilities:

  1. Installation Space Design and Traffic Flow consideration
  2. Providing All Equipment Required to operate the installation (including A/V and computers which can be rented from SIGGRAPH 2001 contractors)
  3. Equipment Shipping and Insurance to/from conference
  4. Sufficient Staffing to cover the conference week
  5. Travel, housing, and substinence for installation staff
  6. Any optional services or conveniences such as a telephone line, computer rental, A/V rental

------

------
============